Studer's Compact Series of Sine Wave Inverters/Chargers integrates three functions: sine wave inverter, battery charger, and transfer system. With power levels from 1.1kVA to 4kVA, these Swiss-made devices provide optimal energy for off-grid, battery charging, or solar charge control. They offer a cost-effective, all-in-one solution with a robust design and optional built-in solar charge controller.Ā This is a special order. Please allow four weeks for shipping.
This product must be installed by a registered electricianĀ with a parallel generation/solar endorsement (from September 1st 2025)Ā who can issue a Certificate of Compliance and Electrical Safety Certificate for completed work. AA Solar can provide this comprehensive service. Alternatively, we can work with your chosenĀ SEANZ-endorsed installers and electricians,Ā providing them with the products' Supplier Declaration of Compliance (SDoC) and theĀ supporting documentation they need.Ā This excludes mobile, motorhome, and marine installs that do not require 230V AC componentry.
Ā
Compact Series Sine Wave Inverter/Charger Explained
The Compact Series of Sine Wave Inverter/Charger by Studer consists of 3 fully automatic functions: a Sine Wave Inverter, a Battery Charger, and a transfer system. Equipped with high-end technology, they perform optimally, thanks to Studer Innotecās extensive experience in the field of electrical supply.
The Compact series includes devices with a power level ranging from 1.1kVA to 4kVA that allow for optimal use of available energy, either as an off-grid inverter, battery charger or solar charge controller. This range of robust products ready to be used offers an excellent price/efficiency relationship for 12, 24, or 48V battery banks.
All inĀ one:
Every product of Compact series combine three functions: performing standalone inverter, powerful battery charger and ultra-fast transfer system. All in a robust casing. Equipped with a programmable auxiliary contact, it allows the start of a generator or second-priority load shedding. Also, these inverter-chargers can be supplied in option with a built-in PWM solar charge controller, making them an āall-in-oneā solar hybrid system or a simple self-consumption/backup system.
Ready to use:
In addition to compact construction, these devices are shipped with assembled battery cables, reducing the system installation and commissioning costs.
The primary parameter adjustments can be done directly on the device's screen, allowing to see the different modes of the inverter.
Compact Series Sine Wave Inverter/Charger by Studer EĀ Certification Standard
The XPC+ 1400-12, XPC+ 2200-24, C 1600-12 and C 2600-24 are certified in accordance with the ECE-R 10 standard. This certification is mandatory in the European Union for all electrical equipment on board transport vehicles.
User Manual compact1600,2400,4800
Data Sheet xpc-complet-2018-en-1
As an authorised SEANZ Parts Supplier and Installer, we require all solar parts covered by AS/NZS Standards 4509, 4777, 5033 and 5139. (This excludes mobile or motorhomes and marine kitsets/products that do not require 230V AC componentry), to be sent to a SEANZ-authorised installer, registered electrician, or professional installer with parallel generation/solar endorsement (from September 1st, 2025) to ensure all safety standards are met and to remove all potential risks and dangers for the end consumer.
Provider Directory - Sustainable Energy Association of New Zealand
Please call us onĀ 09 887 9767Ā to discuss the legal requirements for system design, installations, and commissioning. This includes theĀ Supplier Declaration of Compliance (SDoC), Certificate of Compliance (CoC), Electrical Safety Certificate (ESC), Record of Inspection (ROI), Distributed Generation Application (DG Application) under the EDB network (Electrical Distribution Business), and the electricity retailer's approval.
Key Requirements:
- The installer must provide a Certificate of Compliance (CoC) for the work they completed to ensure the installation is compliant with 5033, 4777, and 4509. (where applicable and within 20 working days)
- An independent inspector must inspect the installation and complete the Record of Inspection. (ROI). Within 20 working days
- The installing electrician or inspector must also sign an Electrical Safety Certificate (ESC) before final connection to the network.Ā
- The registered electrician signing off the COC and or ESC must have a mains parallel generator endorsement on their practising licence (from September 1st 2025)
- It is the inspector's responsibility to enter the ROI on the High-Risk database within 20 working days of issuing the ROI.
We can arrange everything for you or work with your chosen qualified solar installer.